Ship agency · Cambodia

One local agent. Every port call in focus.

Plan your Cambodia port call with local agency support. Select a port to connect with the right representative and prepare a port disbursement estimate request.

Container terminal on the Mekong River in Cambodia

Port disbursement estimate

Get a PDA for your port call

Choose the port, then connect with the local representative responsible for your request. Share vessel particulars, cargo operation and ETA so our team can prepare a quotation.

01Bulk cargo
02Project cargo
03Agricultural products
04General commodities

About BB Kowloon

Your Trusted Local Partner in Cambodia

Local ship agency support backed by practical logistics capability across seaports and river terminals.

BB Kowloon is first and foremost a local Cambodia ship agency. Our logistics capabilities are arranged to support the same port call, cargo movement or customer requirement.

Discover our company
Port cranes and a vessel at a river terminal
Port and terminal operations

What we do

Ship agency first. Logistics connected.

All services
01

Barge Transportation in the Mekong River

For bulk and project cargo movements along the Cambodia-Vietnam river corridor.

02

Port & Terminal Operations

Terminal coordination, cargo-handling support, tally and on-site supervision.

03

Ship Chartering

Chartering support for bulk cargo and project movements when required.

04

Cross-Border Trucking

Border trucking and delivery coordination between Cambodia and Vietnam.

05

Equipment & Vehicle Rental

Equipment and vehicle availability for port, cargo and project requirements.

PPAP network · 2026

Seven river terminals at a glance.

Phnom Penh Autonomous Port (PPAP) maps seven operational terminal sites across the Mekong and Tonle Sap network. Explore each terminal below. These facilities and figures belong to PPAP; BB Kowloon supports customers with local ship agency and logistics coordination.

PPAP map showing the seven LM17, UM2, UM1, TS11, TS3, TS1 and LM26 terminals and waterway connections
LM17 / Container

Container Terminal LM17

Jetty / pontoon
22 × 300 m; 12 × 149 m; 16 × 149 m
Berths
9 berths
River draft
4.5 m
Barge capacity
3,000–4,000 tons (250–300 TEUs)
Handling equipment
4 TCC + 4 FCC: 20–25 MPH; 22 RTG: 20–25 MPH; 2 floating cranes: 15 MPH
Port capacity
1,000,000 TEUs/year
Reefer plugs
256 plugs
Warehouse / facilities
Warehouses: 24 × 60 m; 30 × 60 m
Land size
40 ha (33.22 ha operational)
Navigation time
Cai Mep 28–32 hrs · Cat Lai 21–25 hrs
Distance
Cai Mep 373 km · Cat Lai 345 km
UM2 / Multipurpose

Sub-feeder Multipurpose Terminal UM2

Jetty / pontoon
12 × 46.9 m; 45 m general cargo berth
Berths
2 berths
River draft
4.5 m
Barge capacity
3,000–4,000 tons (250–300 TEUs)
Handling equipment
1 FCC: 15–20 MPH; crawler crane: 100 tons
Port capacity
70,000 TEUs/year
Reefer plugs
36 plugs
Warehouse / facilities
Warehouse: 40 × 150 m
Land size
24.04 ha (5.49 ha operational)
Navigation time
Cai Mep 31–42 hrs · Cat Lai 30–40 hrs
Distance
Cai Mep 503 km · Cat Lai 475 km
UM1 / Multipurpose

Sub-feeder Multipurpose Terminal UM1

Jetty / pontoon
Jetty: 12 × 24 m
Berths
1 berth
River draft
4.5 m
Barge capacity
3,000–4,000 tons (250–300 TEUs)
Handling equipment
1 FCC: 15–20 MPH
Port capacity
60,000 TEUs/year
Reefer plugs
36 plugs
Warehouse / facilities
Warehouse: 30 × 130 m
Land size
4 ha
Navigation time
Cai Mep 32–43 hrs · Cat Lai 27–38 hrs
Distance
Cai Mep 513 km · Cat Lai 485 km
TS11 / Multipurpose

Sub-feeder Multipurpose Terminal TS11

Jetty / pontoon
Jetty: 12 × 60 m
Berths
1 berth
River draft
4.5 m
Barge capacity
3,000–4,000 tons (250–300 TEUs)
Handling equipment
1 FCC: 15–20 MPH
Port capacity
60,000 TEUs/year
Reefer plugs
36 plugs
Warehouse / facilities
Warehouses: 1,848 m²; 2,854 m²
Land size
4 ha
Navigation time
Cai Mep 32–43 hrs · Cat Lai 27–38 hrs
Distance
Cai Mep 513 km · Cat Lai 485 km
TS3 / Multipurpose / passenger

Multipurpose Terminal TS3

Jetty / pontoon
Jetty: 20 × 300 m; 2 floating piers: 42 × 12 m
Berths
6 berths
River draft
4.5 m
Barge capacity
Not stated in PPAP source
Handling equipment
Not stated in PPAP source
Port capacity
Not stated in PPAP source
Reefer plugs
Not stated in PPAP source
Warehouse / facilities
Passenger & tourist station hall: 52 × 17 m
Land size
8.58 ha (1.97 ha operational)
Navigation time
Ho Chi Minh City: approx. 31 hrs
Distance
Ho Chi Minh City: 470 km
TS1 / Passenger

Passenger and Tourist Terminal TS1

Jetty / pontoon
Pontoons: 30 × 12 m; 45 × 15 m
Berths
2 berths
River draft
4.5 m
Barge capacity
Not stated in PPAP source
Handling equipment
Not stated in PPAP source
Port capacity
Not stated in PPAP source
Reefer plugs
Not stated in PPAP source
Warehouse / facilities
Not stated in PPAP source
Land size
0.60 ha (0.23 ha operational)
Navigation time
Ho Chi Minh City: approx. 31 hrs
Distance
Ho Chi Minh City: 470 km
LM26 / Multipurpose / border

Sub-feeder Multipurpose Terminal LM26

Jetty / pontoon
Pontoon: 45 × 15 m
Berths
5 berths
River draft
4.5–5.5 m
Barge capacity
Not stated in PPAP source
Handling equipment
4 conveyors; 100- and 130-ton floating cranes: 15–20 MPH
Port capacity
Not stated in PPAP source
Reefer plugs
Not stated in PPAP source
Warehouse / facilities
Truck scale: 1; warehouse: 30 × 50 m; border gate at Koh Roka–Thuong Phuoc
Land size
21.90 ha (19.86 ha operational)
Navigation time
Cai Mep 17–23 hrs · Cat Lai 15–21 hrs
Distance
Cai Mep 275 km · Cat Lai 247 km

PPAP operations

More context for your Cambodia port call

Cargo activity, port services, inland waterways and planned development across the PPAP network.

Cargo volume

PPAP reports 600,023 TEUs handled in 2025 and 339,606 TEUs in the first six months of 2026.

Port activities

PPAP's activities include port authority services, terminal operations and logistics such as berthing, stevedoring, warehousing and customs clearance.

Inland waterway access

The Cambodia–Vietnam waterway agreement covers regulated Mekong, Tonle Sap, Bassac and Vam Nao routes, alongside selected canals.

Planned development

PPAP outlines LM17 expansion, a special economic zone, a Svay Rieng dry port, more sub-feeder terminals and channel improvements.

The 2026 figures are partial-year results. Development items are PPAP plans and should not be treated as completed facilities.

Selected cargo experience

Proof of work, across cargo types

Operations documented in the company profile, from agricultural products to industrial and oversized cargo.

View all work

How we operate

Fast. Safe. Efficient.

01

Reliable

Route-focused transport planning across the Vietnam–Cambodia corridor.

02

Safe

Secure loading, stable navigation and controlled cargo handling.

03

Efficient

Coordinated barge, port, warehousing and forwarding operations.

Port network in profile

Operational touchpoints

Port imagery and locations presented in the BB Kowloon company profile.

Kampot Port aerial view
Kampot Port
Sihanoukville Port aerial view
Sihanoukville Port
Container Terminal LM17 aerial view
Container Terminal LM17

Plan your next movement

Building long-term value together.

Start a conversation